Insulation and stabilisation of the dikes, TÜMAD_Ivrindi Gold mine - Turkey 2021-2022

295 000 sqm
Rolls: 5,0 x 35m
EUROBENT 4500/350/300 Compo BRAD 15

As a part of the improvement of flood protection in the Lower Odra Valley, extensive rehabilitation measures have been carried out on existing dikes for several years. The dike from km 28.4 to 31.0 was previously excluded from the rehabilitation measures because a possible extension of the Hohensaaten-Friedrichsthaler Waterway (HO-FR-WA) was planned. With the completion of the approval procedure for the HO-FR-WA expansion project, this section of the dike was earmarked for restoration.

As a sealant, a bentonite mat was planned to be laid in accordance with EUROBENT 4500/350/300 Compo BRAD 15.